Skip to content
Aerial view of the HONGFENG cable tray factory in Liaocheng, Shandong

IEC 61537:2023SGS-verifiedLiaocheng, China

Cable tray systems, load-tested to IEC 61537.

Ladder, perforated, trunking and wire mesh tray with strut channel and fittings — manufactured in a 25,000 m² facility in Shandong and exported to more than 25 countries.

Explore systems
Load test · §10.4 Pass
Cable ladder 600 × 100 mm
HF-Q-T-01A-600100-H8 · post-galvanized
Span
1,200mm
Safe working load
2,680N/m
Mid-span deflection
8.0mm
Limit 12 mm · L/100
1.7 × SWL
4,556N/m · no collapse
SGS QDPL2406001066TF-1
Production facility
25,000m²Production facilityLiaocheng, Shandong
Production facilities
50+Production facilitiesOf various specifications
Annual output value
RMB1.5bnAnnual output valueUp to
Regular inventory
49,900tRegular inventoryHeld in stock
Lead time
7–10daysLead timeAfter deposit, by order quantity
Quality inspection steps
12Quality inspection stepsRaw material to delivery

Clients & partners

Trusted by project owners in energy, infrastructure and manufacturing.

  • Sinopec
  • CNPC — China National Petroleum Corporation
  • CNOOC — China National Offshore Oil Corporation
  • Siemens
  • Schneider Electric
  • CSCEC — China State Construction Engineering
  • China Railway Group (CREC)
  • Honeywell
  • ExxonMobil
  • Baosteel
  • Datang International
  • Schlumberger
  • Huawei
  • BYD
  • ChemChina — China National Chemical Corporation
  • Sinochem Group
  • Boeing
  • China Minmetals Corporation
  • COSCO
  • CSIC — China Shipbuilding Industry Corporation
  • AVIC — Aviation Industry Corporation of China
  • Lockheed Martin
  • Raytheon
  • Chalco — Aluminum Corporation of China
  • Yanchang Petroleum
  • Jungheinrich
  • Lenovo
  • Quanta Computer
  • KEDACOM
  • China Tobacco
  • Hua Yan Water
  • Lexus
  • NASCAR
  • EDGII

03Product lines

Cable tray, supports and fittings from one factory.

Four tray systems, strut channel and a full set of fittings, produced in-house from coil to finished section. Ladder, perforated and trunking series — galvanized and stainless — are verified by SGS to IEC 61537:2023.

Bright zinc wire mesh cable tray, three-quarter view
04 / Wire mesh

Cable tray system

Wire Mesh Cable Tray

Welded steel wire basket for data and low-voltage cabling — light, open and quick to reroute.

Width
50–800 mm
Height
25–200 mm
Wire Ø
3–8 mm
Electro-galvHDGZAMPowder coatSS 304 / 316Aluminium
Specifications
Stack of slotted galvanized strut channel
05 / Strut channel

Support system

Strut Channel

Cold-formed C-profile with inturned lips — the support member for hangers, cantilever arms and brackets.

Profile
41 × 41 · 41 × 21 mm
Thickness
1.0–3.0 mm
Length
2–6 m
Pre-galvHDGSS 304 / 316Aluminium
Specifications
Set of cable tray fittings: bend, tee, cross, reducer, cover, splice plates and fasteners
06 / Fittings

Fittings & accessories

Fittings & Accessories

Bends, tees, crosses, reducers, covers, splice plates, fasteners and supports for a complete run.

Fittings
Bend · tee · cross · reducer
Joints
Splice plates, fasteners
Supports
Arms, brackets, hangers
Pre-galvHDGZAMPowder coatHDG + powderSS 304 / 316Aluminium
Catalogue

04Cable tray selector

Specify a system in three steps.

Choose the installation environment, the cable load and what matters most. The recommendation updates as you go and can be added to your RFQ.

01 Environment
02 Cable load
03 Priority

ISO 9223 · atmospheric corrosivity

C3–C4

  1. C1
  2. C2
  3. C3
  4. C4
  5. C5
  6. CX

C1 very low to CX extreme. The recommended finish follows the class of the site.

RecommendationISO 9223 C3–C4
Ladder Cable Tray
01 / HF-Q-T-01AIEC 61537 · SGS

Ladder Cable Tray

Hot-dip galvanized steel

  • Side rails carry large power cables over long support spans.
  • Open construction gives the highest airflow around cables.
  • Outdoor (C3–C4): hot-dip galvanized steel recommended.

Alternative: Perforated Cable Tray · HDG + powder coat (duplex)

Size · SGS series list

Thickness
mm
Declared SWL
N/m
Length
3,000 mm

HF-Q-T-01A-600100 · IEC 61537:2023 series list

Compare systems

Guidance based on general IEC 61537 and ISO 9223 practice. Final selection, spans and fittings are confirmed by our engineering team with your quotation.

05Manufacturing

From coil to finished tray, under one roof.

Cutting, punching, forming, welding and surface treatment run in-house, with twelve inspection steps from raw material procurement to delivery.

08 steps · coil to dispatch

  • Steel coil inventory hall

    01 / 08

    Raw material

    Incoming coil is checked before it is released to production.

  • Stacks of cut steel blanks ready for forming

    02 / 08

    Slitting & cutting

    Coil is slit to strip width and cut to blank length for each section.

  • Coil-fed roll forming lines

    03 / 08

    Punching & roll forming

    Coil-fed lines punch slots and perforations and roll-form side rails and bases.

  • Wire mesh cable tray stacked beside production equipment

    04 / 08

    Welding

    Ladder rungs and wire mesh grids are welded in-house.

  • Powder coating line with overhead conveyor

    05 / 08

    Surface treatment

    Electrostatic powder coating on our own line; pre-galvanized, hot-dip galvanized, ZAM and stainless finishes to specification.

  • Finished cable tray inventory awaiting inspection

    06 / 08

    Inspection & testing

    Twelve inspection steps from raw material to delivery, with load and corrosion testing on finished products.

  • Perforated cable tray bundles wrapped for export

    07 / 08

    Packing

    Protective film and reinforced cartons, with wooden pallets where the shipment needs them.

  • Palletized finished goods in the warehouse

    08 / 08

    Dispatch

    Typically 7–10 days after deposit, depending on order quantity.

Twelve inspection steps from raw material to delivery — including load, coating adhesion and salt spray testing on finished products.

Inside the factory

06Compliance & testing

Independently tested. Traceable to the certificate.

Ladder, perforated and trunking series in galvanized and stainless steel are verified by SGS to IEC 61537:2023. Each card opens the issued document.

Test span
1,200 mm
SWL
2,680 N/m
Max. deflection
8.0 mm ≤ 12 mm
Overload 1.7 × SWL
No collapse
Electrical continuity
10–15 mΩ ≤ 50 mΩ
Corrosion · HDG
Class 8 · 85 μm

SGS reports QDPL2406001066TF-1 … TF-6 · IEC 61537:2023 §10.4, §11, §14

IEC 61537:2023 · Product verification

Type-tested by SGS: load, deflection, electrical continuity, corrosion resistance.

  • QDPL2406001066-1

    Cable ladder

    Mild steel, zinc coated

    IEC 61537:2023

    Issued 2024-08-07

  • QDPL2406001066-2

    Perforated cable tray

    Mild steel, zinc coated

    IEC 61537:2023

    Issued 2024-08-07

  • QDPL2406001066-3

    Cable trunking

    Mild steel, zinc coated

    IEC 61537:2023

    Issued 2024-08-07

  • QDPL2406001066-4

    Cable ladder

    Stainless steel

    IEC 61537:2023

    Issued 2024-08-07

  • QDPL2406001066-5

    Perforated cable tray

    Stainless steel

    IEC 61537:2023

    Issued 2024-08-07

  • QDPL2406001066-6

    Cable trunking

    Stainless steel

    IEC 61537:2023

    Issued 2024-08-07

CE · Low Voltage Directive 2014/35/EU

Attestations of conformity for cable tray to EN 61537.

  • M.2023.206.C88198

    LVD Attestation of Conformity

    Cable tray · Model HF01A

    EN 61537:2007

    Issued 2023-07-26 · valid to 2028-07-25

  • M.2025.206.C124601

    LVD Attestation of Conformity

    Cable tray

    EN 61537:2007 · IEC 61537:2023

    Issued 2025-08-15 · valid to 2030-08-14

ISO · Management systems

Scope: processing and sales of cable trays and related accessories.

  • 609-25-QA-15110-R0-S

    Quality management

    Cable trays & accessories

    ISO 9001:2015

    Issued 2025-07-25 · valid to 2028-07-24

  • 609-25-EO-15311-R0-S

    Environmental management

    Cable trays & accessories

    ISO 14001:2015

    Issued 2025-07-25 · valid to 2028-07-24

  • 609-25-SA-15112-R0-S

    Occupational health & safety

    Cable trays & accessories

    ISO 45001:2018

    Issued 2025-07-25 · valid to 2028-07-24

07Factory visits & audits

Buyers inspect before they order.

Procurement and engineering teams visit Liaocheng to review production, stock and samples before release.

Export countries
25+Export countriesWorldwide
Clients served
100+Clients servedCumulative
Core repeat clients
20+Core repeat clientsActive each year

09Request a quote

Send us your cable schedule. We return an itemized quotation.

  • Itemized quotation per straight section, fitting and accessory
  • Dimensions checked against the IEC 61537 series list
  • Lead time confirmed — typically 7–10 days after deposit, by quantity
  • OEM / ODM and non-standard dimensions on request
WeChat

Quick request