
Manufacturing · Liaocheng, Shandong
From coil to finished tray, under one roof.
Cutting, punching, roll forming, welding and powder coating run in-house — with twelve inspection steps between the coil store and the loading bay.
- Production facility
- 25,000m²
- Production facilities
- 50+
- Quality inspection steps
- 12
- Lead time
- 7–10days
01Production flow
Eight steps, one factory.
Every straight section and fitting follows the same route through the plant.
01Raw material
Incoming coil is checked before it is released to production.
02Slitting & cutting
Coil is slit to strip width and cut to blank length for each section.
03Punching & roll forming
Coil-fed lines punch slots and perforations and roll-form side rails and bases.
04Welding
Ladder rungs and wire mesh grids are welded in-house.
05Surface treatment
Electrostatic powder coating on our own line; pre-galvanized, hot-dip galvanized, ZAM and stainless finishes to specification.
06Inspection & testing
Twelve inspection steps from raw material to delivery, with load and corrosion testing on finished products.
07Packing
Protective film and reinforced cartons, with wooden pallets where the shipment needs them.
08Dispatch
Typically 7–10 days after deposit, depending on order quantity.
02Capacity & track record
Built for project volumes.
- Production facility
- 25,000m²Production facilityLiaocheng, Shandong
- Production facilities
- 50+Production facilitiesOf various specifications
- Annual output value
- RMB1.5bnAnnual output valueUp to
- Regular inventory
- 49,900tRegular inventoryHeld in stock
- Lead time
- 7–10daysLead timeAfter deposit, by order quantity
- Quality inspection steps
- 12Quality inspection stepsRaw material to delivery
- Export countries
- 25+Export countriesWorldwide
- Clients served
- 100+Clients servedCumulative
- Core repeat clients
- 20+Core repeat clientsActive each year
03Surface treatment
Electrostatic powder coating on our own line.
Powder coat is applied over galvanized base sheet. Pre-galvanized, hot-dip galvanized, ZAM, stainless steel and aluminium are supplied to specification.

Powder coating process
- Pretreatment
- 5 stages
- Stages
- Degrease · pickle · condition + phosphate · rinse · dry
- Drying
- 80–100 °C · 30 min
- Electrostatic voltage
- 50–100 kV
- Film thickness
- 60–120 μm
- Curing
- 180–220 °C · 20–30 min
- Powder recovery
- Up to 95 %
- Batch sampling
- Cross-cut adhesion · impact · salt spray
04Quality & testing
Twelve inspection steps. One independent type test.
- Twelve inspection steps from raw material procurement to delivery
- Incoming coil checked before release to production
- Load and corrosion testing on finished products
- Powder coating batches sampled for adhesion, impact and salt spray
- Type-tested by SGS to IEC 61537:2023 — ladder, perforated and trunking, galvanized and stainless
- ISO 9001, ISO 14001 and ISO 45001 management systems
- Test span
- 1,200 mm
- Safe working load
- 2,680 N/m
- Overload 1.7 × SWL
- No collapse
- Max. mid-span deflection
- 8.0 mm ≤ 12 mm
- Electrical continuity
- 10–15 mΩ ≤ 50 mΩ
- Corrosion · post-galvanised
- Class 8 · 85 μm
SGS QDPL2406001066TF-1 … TF-6 · IEC 61537:2023
05Packing & dispatch
Packed for sea freight.
Protective film and reinforced cartons, with wooden pallets where the shipment needs them. Typical lead time is 7–10 days after deposit, depending on quantity.



Factory visit
Audit the factory before you order.
Procurement and engineering teams visit Liaocheng to review production, stock and samples. Tell us your dates and we arrange the visit.
- +86 130 2055 8968